In late 2022, Storm Geomatics were asked by their client Atkins Global to carry out a bathymetric survey up and down stream of a site on the River Avon in Chippenham, Wilshire.
This watercourse survey was conducted on behalf of the Environment Agency through Storm’s long standing client JBA Consulting Limited during Autumn 2022.
In late 2021 Storm Geomatics visited the site of Springwater Park, Bury, to assess a potential monitoring survey for a vegetated area of the park suffering bank slippage.
Between July and November 2021, Storm Geomatics undertook a survey in the Rhondda Valley for Natural Resources Wales on behalf of engineering consultancy ARUP.
In early spring 2021 Storm Geomatics were approached by an existing client to carry out topographic & bathymetric surveys on the River Aire at Newlay to provide information for asset recovery works.