Case Studies

Flood Asset Monitoring

Scroll

The Background

Date
September 2026
Client
Land & Water

Storm Geomatics were comissioned to undertake an asset survey of a flood storage area in Gloucestershire. Consistent annual monitoring at Horsbere Flood Storage Area helps the Environment Agency identify structural change and maintain confidence in a critical embankment asset.

63

monitoring pins precisely levelled

31

embankment check cross sections

2m

topographic survey grid interval

7

Gloucestershire sites in the programme

Process

The Challenge

The Horsbere Brook runs alongside the nature reserve, separated by an embankment and overflow structures designed to operate during flooding. Reliable repeat data is needed to determine whether the asset geometry is changing over time.

Desiccation of ground.

After prolonged summer heat, visible desiccation cracking created an additional condition to record, report and discuss with Environment Agency representatives on site.

Process

The Solution

The survey team used a consistent methodology across three separate but complementary data sets.

01

Precise Levelling

Monitoring pins along the embankment were levelled back to the original 2018 datum for dependable year-on-year comparison.

02

Cross Sections

Specified check cross sections captured the embankment profile at consistent extents and orientations.

 

 

03

Topographic survey

A detailed grid survey captured the primary spillway between Horsbere Brook and the nature reserve.

 

 

Process

The Results

Annual datasets were overlaid against previous survey results to assess potential structural movement. By maintaining a consistent survey methodology and delivery format, Storm Geomatics provided their client with  a clearer basis for judging whether differences represent genuine change.

Site observations were captured alongside measured data, so visible issues such as desiccation cracking are not lost between fieldwork and engineering review. This level of detail is possible because Storm Surveyors specialise in this type of project, such features will often be missed by geospatial surveyors who are not experienced in flood asset monitoring.

The deliverables provided evidence ready for comparison and review of the assets including:

  • Updated RTK base and control network comparisons
  • Comparison XYZ tables
  • Comparison cross-section drawings
  • Condition photographs and field observations
“Good asset decisions depend on more than a single survey. They depend on data that remains comparable year after year.”
- Matt Maddalena
Survey Manager